• Nederlands (NL)
  • English (UK)
  • Home
  • Shipelectrics
    • Gre 5
    • Hunter
    • Atlantis
    • Banjaard
    • Kortvliet
    • Vigilant
    • Hurricane
    • Windhunter
  • Engineering
  • Container cranes
  • Meggertest
  • Switchboard construction
  • Info +316-54902761
Banjaard

Your system has to be reliable, especially at sea. The ship has to react like you expect. Over time, requirements for electric systems and ships change. Changing notions require more and other devices in wheelhouse and engine room. The installation matures from infant to adult. The easy solution is to place new equipment where there is -at that moment- room for it, but is that also the best solution?

Read how the electric system on the Banjaard matured (dutch).

 

back to ship-building

Wheelhouse before renovation
  • Wheelhouse before renovation
Battery
  • Battery
Wheelhouse before renovation
  • Wheelhouse before renovation
Main control panel after renovation.
  • Main control panel after renovation.
Main control panel before renovation.
  • Main control panel before renovation.
Wheelhouse after renovation
  • Wheelhouse after renovation
Wheelhouse after renovation
  • Wheelhouse after renovation
Banjaard
  • Banjaard
Control panel
  • Control panel
Design of control panel
  • Design of control panel

Copyright © 2016. All Rights Reserved.

Gemaakt door IDa Alberdina.